Slavabogu Nigeria Limited has 9 ongoing project in Nigeria

Lagos State Projects

�Reconstruction / Upgrading of Onikan Stadium

Stadium design and construction and other ancillary works.

Project Completion Period: 12 Months.

31.02% completed

�Reconstruction of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja

Construction of single carriageway, side drainage, walkways and Other ancillary works; Overall length= 1420m.

Project Completion Period: 12 Months.

97.41% completed.

�Completion of 62 Bedroom Hotel and Upgrading of Facilities at Lagos State VIP Chalets in Badagry LGA

Completion of 52 Bedroom Hotel and Upgrading of Facilities at Lagos State VIP Chalets and Other ancillary works.

Project Completion Period: 12 Months.

7.40% completed.

Osun State Projects

�Construction Of Shopping Mall

Sub Structure work for shopping mall at fakunle area

Project Completion Period: 9 Months.

97.8% completed.

�Rehabilitation of Ede/Ejigbo Road

Patching of ede-ara-ejigbo road, additional works (patching) of ejigbo township OYSB road and Army barracks JCT-oke gada-cottage hospital JCT, Ede.

Project Completion Period: 12 Months.

94.8% completed.

Ondo State Projects

�Construction Of Gaga road

Sub Structure work for shopping mall at fakunle area

Project Completion Period: 9 Months.

97.8% completed.

Akwa Ibom State Projects

�Construction of 8.5Km Nduetong Oku-ibiaku Urban road and spur in Uruan local Govt. area

Construction of 8.5Km Nduetong Oku-ibiaku Urban road and spur in Uruan local Govt. area

Project Completion Period: 9 Months.

97.8% completed.

Cross River State Projects

� Consturction Of Calabar Spaghetti Flyover (Interchange) at Odunkpani Junction

Consturction Of Calabar Spaghetti Flyover (Interchange) at Odunkpani Junction. area

Project Completion Period: 9 Months.

97.8% completed.

� Construction of Ikom Bridge. area

Construction of 8.5Km Nduetong Oku-ibiaku Construction of Ikon bridge 0f 497m. area

Project Completion Period: 9 Months.

97.8% completed.

� Construction of Ikon Bridge. area

Construction of Teachers Institute Centre which comprises of Administrative building, 450 seater hall, Library, Laboratory, Male and Female Toilet, hostels and maind building

Project Completion Period: 9 Months.

78.8% completed.

Pictures Of the Onikan stadium and progress

design view

Design view

Design view

Design view

Design View

Entrance Design

outside view design

Arial view

Demolition view

Demolition view

Pictures Of VIP Challet in badadgry, Lagos State

3d view of 62 bedroom hotel

Entrance view

Rear view of the lounge

Proposed Lounge view

Proposed Room View

Bathroom and Toilet View

Cupbaord and mirror View

Room View of the hotel

Rear View of The VIP Challet 3dview

Parking lot of the Vip Challet 3dview

back view of the VIP Challet 3dview

Room of the VIP Challet 3dview

Construction Progress View

Construction Progress

Construction Progress

Construction progress

Construction of the challets

Piling machine work

COMPLETED SCHOOL PROJECT IN OSOGBO

COMPLETED SCHOOL PROJECT IN OSOGBO

Pictures of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja

Site Office

Casting of the concrete wall

Casting of the drainage

Laid Stone base

Compacting the Road

Proposed Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja

Laying of Asphalt

Asphalt Layed part

Asphalt layed part/Building

Asphalt Layed Part

Construction of Hayat Kimya Holding factory project at Opic Estate Agbara, Ogun State

Ware house Foundation

Erection of Warehouse building

Construction of Hayat Kimya Holding factory project

Construction of Hayat Kimya Holding factory project

Construction of Hayat Kimya Holding factory project

Erection of Werehouse building and Field

Administrative Building

Hygiene factory/Building

Production area of Hygiene building?

Warehouse area of Hygiene building

Utility Buildings

Utility Buildings

Reservior Base

Installation of Gas filling Station

Installation of Gas filling Station

Installation of Gas filling Station

Other Sites

SLAVABOGU CAMP and PLANT SITE

SLAVABOGU CAMP and PLANT SITE

ASPHALT PLANT PARKER M3000 AT OSOGBO(CAPACITY 240T0NS/HR)

ASPHALT PLANT PARKER M3000 AT OSOGBO(CAPACITY 240T0NS/HR)

CONCRETE BATCHING PLANT 105m3/hr

CONCRETE BATCHING PLANT 105m3/hr

CRUSHER 250t/hr Capacity

CRUSHER 250t/hr Capacity

Lagos Real Estate Project

Lagos Real Estate Project